GSM Roofing logo

GSM Industrial using helicopter to install rooftop industrial ductwork

This is some footage of a project where GSM Industrial installed a Solvent Recovery system which was transported from a shuttered plant out of state to a location in south east PA. Due to the distance from the ground to the center of the roof, we used a helicopter to pick and set the pieces. Although most of the ductwork was salvaged and reused, GSM Industrial also fabricated various structural steel supports, spool pieces and custom ductwork modifications.